Location
Wynot Village Office, 423 St. James Avenue, in Wynot
Location accessible to handicapped
Interpreter for deaf provided upon request
Details
The proposed project involves approximately 9.68 miles of N-12, 5.37 miles of S-14H,
and 0.27 miles of S-14B. The project would consist of milling (a process of grinding a specified
depth from the existing roadway surface) and resurfacing with asphalt, removing and replacing
guardrail, extending culverts, and shoulder work.
The project would also repair two bridges along S-14H: one over Second Bow Creek
and one over its tributary. In addition to the bridge repairs, two bridges along N-12 would be
replaced.
Personnel from the Department of Roads will be available to answer questions, receive
comments, and discuss any aspect of the proposed highway improvement project. Information
regarding the project will be available after the meeting on the NDOR website at
www.roads.nebraska.gov/projects/ by clicking on the “Wynot East & West” link. Interested
persons unable to attend the meeting may post questions and/or comments on NDOR’s
MindMixer website at http://neroads.mindmixer.com.
Contact:
Kevin Domogalla, District 3 Engineer, Norfolk, (402) 370-3470
STP-12-6(117)
NR5-ZS